Abraka–Oben Road Reconstruction

The Abraka–Oben Road Reconstruction is a transportation infrastructure intervention executed by the Niger Delta Development Commission in Delta State. The project involved the reconstruction of approximately 9.6 kilometres of road with an 8-metre asphalt carriageway. The intervention required the removal and replacement of more than 80,000 cubic metres of unsuitable material along deteriorated sections of the road. Before reconstruction, the road had become severely deteriorated and difficult to navigate, creating transportation and security challenges for road users. The reconstructed road provides an improved transport connection for residents, businesses, farmers and industrial communities along the Abraka–Oben corridor, supporting the movement of people, agricultural produce and commercial goods. The project was inaugurated by the Minister of Regional Development, Engr. Abubakar Momoh, on 23 February 2025.
NDD-INF-005
Completed

PROJECT OVERVIEW

The Abraka–Oben Road Reconstruction is a transportation infrastructure intervention executed by the Niger Delta Development Commission in Delta State. The project involved the reconstruction of approximately 9.6 kilometres of road with an 8-metre asphalt carriageway. The intervention required the removal and replacement of more than 80,000 cubic metres of unsuitable material along deteriorated sections of the road. Before reconstruction, the road had become severely deteriorated and difficult to navigate, creating transportation and security challenges for road users. The reconstructed road provides an improved transport connection for residents, businesses, farmers and industrial communities along the Abraka–Oben corridor, supporting the movement of people, agricultural produce and commercial goods. The project was inaugurated by the Minister of Regional Development, Engr. Abubakar Momoh, on 23 February 2025.

Project Scope

APPROVED SCOPE

Reconstruction of the Abraka–Oben Road to restore road connectivity, improve transportation and support economic activities across industrial and agricultural communities in Delta and Edo States.

DELIVERED SCOPE

9.6-kilometre reconstructed road. Asphalt pavement. 8-metre carriageway width. Replacement of more than 80,000 cubic metres of unsuitable material.

PROJECT DETAILS

MINISTRY

Federal Ministry of Regional Development.

IMPLEMENTING AGENCY

Niger Delta Development Commission (NDDC).

CONTRACTOR

PROJECT TYPE

Road

LOCATION

STATE

LOCAL GOVERNMENT AREA

Ethiope East Local Government Area

COMMUNITY

Abraka Oben Other industrial and agricultural communities along the road corridor.

DELIVERY & PROGRESS

How far has the project progressed?
Track implementation against the documented project scope, delivery status and latest verified progress.

IMPLEMENTATION STATUS

Completed

DELIVERED SCOPE

9.6-kilometre reconstructed road. Asphalt pavement. 8-metre carriageway width. Replacement of more than 80,000 cubic metres of unsuitable material.

LATEST PROGRESS

100

FINANCIAL INFORMATION

Financial figures are shown separately so approved funding, contract value and actual disbursement are not treated as the same measure.

APPROVED AMOUNT

CONTRACT AMOUNT

AMOUNT DISBURSED

EVIDENCE & VERIFICATION

This project record is based on documented sources. Open the primary source to examine the evidence behind the information presented above.

 

PRIMARY SOURCE

Niger Delta Development Commission (NDDC)

SOURCE DATE

17/04/2026

SOURCE TYPE

Federal Government

VERIFICATION

LAST VERIFIED

31/10/2026

VERIFICATION NOTES

NDDC confirms the inauguration of the 9.6-kilometre Abraka–Oben Road in February 2025. The NDDC Executive Director of Projects, Victor Antai, provided the project scope at the inauguration. The documented construction scope includes a 9.6km asphalt pavement with an 8-metre carriage width. More than 80,000 cubic metres of unsuitable material were reportedly replaced during reconstruction. The road connects industrial and agricultural communities across the Delta–Edo corridor. The contractor’s name, original approved amount, contract amount and amount disbursed are NIL. Do not confuse this project with the separately flagged-off Abraka–Agbor Road reconstruction.

PROJECT TIMELINE & UPDATES

Follow the documented history of this project, including key milestones, implementation updates and changes recorded in the public record.

Date Milestone February 2025 Reconstruction completed and road inaugurated. 23 February 2025 Minister of Regional Development commissioned the road. 17 April 2026 NDDC reiterated the project’s inauguration in its regional achievements report.

LATEST UPDATES

23 February 2025 — Commissioning The Minister of Regional Development, Engr. Abubakar Momoh, inaugurated the reconstructed 9.6-kilometre Abraka–Oben Road. 23 February 2025 — Project scope announcement NDDC Executive Director of Projects, Victor Antai, explained that the project involved a 9.6-kilometre asphalt pavement with an 8-metre carriageway and replacement of more than 80,000 cubic metres of unsuitable material. 17 April 2026 — NDDC confirmation The Commission reiterated the inauguration of the Abraka–Oben Road in its report on regional development achievements.

PUBLIC RECORD

Transparency includes a record of corrections and citizen-submitted information. These entries are presented separately from verified project evidence.

CORRECTIONS & CLARIFICATIONS

No corrections recorded.

CITIZEN REPORTS

No citizen reports recorded.